About PT.PP

Austrian Embassy, Jakarta

Austrian Embassy

Green Building - Target Gold (Target)
GBCI

Construction of the building was carried out in 12 months and was completed in 2011. The two-story building has an area of ​​2.300m2. Although this is a small building, but applying the concept of high technology on Green Building. Building applicable "in the concrete core temperature control", "air tight system" and "the golden foam insulation system". It is a hi-tech system was first implemented in Indonesia Building